PS1 Gets Spacial

Finally lifted the second long wall and the roof. It’s been an interesting process. I’ve only had access to help sporadically, so I’ve been developing techniques to make these moments easier with fewer people. For example, I created hinges that pinned the walls to the floor deck and ensured that when lifted, the wall would settle in the right spot at the edge of the floor and not be able to tip too far. And I built the roof in two sections on the ground in the shop with bolted connections so it would be stronger. Then, we lifted the light sections by hand up on top of the walls. Everything has gone together brilliantly.

It’s exciting to start to see some verticality and space!

Gallery here.