i’ve been framing walls, gathering materials, developing the details for a few key places, squaring and sheathing the first wall, and researching where to source the last of the materials i’ll need to finish building the shell. below are some results, including the tiny stack of red metal roofing. so cute!
coming soon: verticality and space!
alternate view via simpleviewer gallery here.
This entry was posted on Wednesday, October 21st, 2009 at 9:21 pm and is filed under Pocket Shelters and tagged with construction, Design + Build, Framing, Metal, Pocket Shelters, Process, Wood. You can follow any responses to this entry through the RSS 2.0 feed.
Subscribe to entries
Subscribe to comments
Theme by Graph Paper Press
© 2010 by Aaron Maret | Design Build Studio
